Plan Status: #547 was successful

Build: #547 was successful

History

Previous
  1. #537 (Successful)
  2. #538 (Failed)
  3. #539 (Failed)
  4. #540 (Failed)
  5. #541 (Failed)
  6. #542 (Failed)
  7. #543 (Failed)
  8. #544 (Failed)
  9. #545 (Failed)
  10. #546 (Successful)
  11. #547 (Successful)

Plan Navigator

Build #547

Build Result Summary

Details

Trigger
Code has been updated by Matt Raible.
Revision
3593
Completed
Duration
35 minutes
Successful since
#546 ()
Labels
None
163 tests in total

Test Summary

  • 0 New Failures
  • 0 Existing Failures
  • 0 Fixed

Code Changes

JIRA Issues

  • Unknown Issue Type

    APF-1296

    Could not obtain issue details from JIRA

Powered by a free Atlassian Bamboo open source license for AppFuse. Try Bamboo - The Zen of Continuous Integration.